Blog

Planning the Changeover Before a Radio System Upgrade

Planning the Changeover Before a Radio System Upgrade In addition to reaching dispatch and for the dispatcher to reach field personnel, there will always be a need for communication during a radio system upgrade. Therefore, the integration of personnel needs to be considered along with the coordination of the equipment installation, changes to the RF

Read More »

Catching RF Problems Before Equipment Reaches the Tower

Installation Readiness Begins on the Ground Discovering a damaged connector, incorrect setting, or unresolved test result after equipment is mounted complicates a job that was supposed to be an installation. Preinstallation RF testing moves those questions to the workbench, where components remain accessible and the configuration can be examined before tower work begins. TX RX

Read More »

Most Popular:

Scroll to Top